Task links make relationships and delivery dependencies visible to everyone working on the plan. Use them when the connection between two tasks affects how people understand, sequence, or complete the work.

  1. Open the task's detail page.

  2. In the links section, choose the control to add a link.

  3. Search for the related task by name or task key.

  4. Choose the relationship that describes the connection — blocks, relates to, or duplicates — and save.

The same relationship is visible from both tasks, each shown from its own side.

Mark a blocking dependency

Choose blocks when one task must be completed before another can move forward. If Task A blocks Task B, Task B is shown as "blocked by" Task A.

  • The blocked indicator is automatic while the blocking task is not done.

  • When the blocking task reaches Done, the blocked indicator clears.

  • A blocking task is surfaced through its relationship views; it does not need a separate "blocking" status.

To find blocked tasks, use Filters to show work that is blocked by other tasks. See Filtering & search.

Link type

Use it when

Behavior

Blocks

Task A must be completed before Task B can proceed

Directed; B shows "blocked by A" until A is done

Relates to

The connection is informative and does not create a delivery dependency

Symmetrical: if A relates to B, B relates to A

Duplicates

One task repeats another

Inverse view shows the other task as duplicated by it

For duplicates, archive the duplicate when it will not be worked on, so the original remains the source of truth for the work.

Plan in dependency order

  1. Before starting dependent work, open its links and confirm whether it is blocked.

  2. Resolve or complete blockers first.

  3. Then move the dependent task forward.